List any minor changes from the original RAWP and their justifications. 5. Institutional & Engineering Controls Ongoing requirements to maintain site safety:
Description of any excavation or installation of physical barriers. 4408 rar
Below is a standard draft template based on NYSDEC and professional environmental engineering standards. Draft Remedial Action Report (RAR) List any minor changes from the original RAWP